Reading and preparing bored pile Bill of Quantities (BOQ)

A guide to understanding bored pile BOQ items: cost per meter/pile, integrity testing fees, and equipment mobilization costs.

Bored pile BOQ cost estimation table and line item quantity breakdown
01

Bored pile BOQ line items

Bored pile BOQs break down into: 1) Equipment mobilization, 2) Per pile/meter drilling and concreting, 3) Seismic integrity test fees.

Interested in bored-pile services?

We are happy to advise on dry-process bored piles. Call 086-888-7703 for more information.

📞Call💬LINE