Dry-process bored-pile contractor

TAWANCHAI KHEMJOH COMPANY LIMITED

Dry-process bored piles in 0.35, 0.40, 0.50, and 0.60 metre diameters, backed by more than 20 years of experience, skilled crews, and engineering support.

Send the diameter, quantity, length, and location for a preliminary quotation

Tawanchai crew operating tripod bored-pile rigs at a real project site
FIELD / 01Real work. Dry process. Tripod rigs.
20+ yearsBored-pile experience
Ø 0.35–0.60 mBored-pile diameters
From 1 pileProjects welcomed

ENGINEERING CALCULATOR

Bored Pile Material & Safe Load Estimator

Calculate concrete volume, steel cage weight, safe load capacity, and budget instantly.

100% Free Engineering Tool

Bored Pile Material & Load Capacity Estimator

Select pile diameter, depth, and quantity to calculate concrete, steel, safe load capacity, and get an instant quote via LINE.

20 meters
10m20m32m
10 piles
1 ต้น50 ต้น150 ต้น
Total Concrete Volume (+5% margin)20.3
Est. Steel Cage Weight1,523 kg
Safe Load Capacity per Pile~39 Tons / pile
Estimated Budget Range143,000 - 173,000 THB
⚠️This is a preliminary budget estimate only — not a final quote. Contact us for an official quotation after site inspection.
Send Specs to Get LINE Quote

* Calculations are preliminary engineering estimates. Tawanchai engineers inspect site conditions before issuing final quotes.

Our services

Why customers choose Tawanchai

We provide complete bored-pile work, pile testing, and advice on the dry-process bored-pile method.

View all
01

Dry-process bored piles

Dry-process bored piles in 0.35, 0.40, 0.50, and 0.60 metre diameters.

  • Tripod rig
  • Temporary casing
02

Complete material and labour service

A complete bored-pile service covering materials, equipment, and labour.

  • Projects from one pile upwards
  • Quality materials and equipment
03

Seismic Integrity Test

Pile-integrity testing using stress-wave signals.

  • Hand-held hammer
  • Accelerometer transducer
04

Dynamic Load Test

Testing used to analyse pile load-bearing capacity.

  • Strain gauges
  • Accelerometer

30-SECOND DECISION WIZARD

Smart Bored Pile Selection Wizard

Answer 3 quick questions to receive personalized pile diameter and depth recommendations.

30-Second Smart Wizard

Find the Ideal Bored Pile Specs for Your Building

Engineering Recommendation
Recommended Pile DiameterØ 35 - 50 cm
Recommended Depth Range18 - 24 เมตร
Vibration & Neighbor Risk Level🟢 100% Safe, Zero-vibration, Quiet Operation
Send Specs to LINE for Quote

GEOTECHNICAL DATABASE

77 Province Soil Engineering Guide

Check estimated hard soil layer depth and recommended casing length for your area.

77 Province Soil Engineering Guide

Check Recommended Pile Specs & Soil Depths for Your Zone

Est. Hard Soil Layer Depth20 - 24 เมตร
Recommended Casing Length12 - 15 เมตร (ป้องกันดินเหนียวอ่อนทรุด)
Popular Pile Diameters in AreaØ 35 - 60 ซม. (ตามน้ำหนักอาคาร)
💡 Geotechnical Engineering Tip:

Soft clay layer is approximately 12-14m thick. Deep casing is recommended to prevent hole collapse and water seepage.

Standard Engineering Workflow

Dry-Process Bored Pile Step-by-Step Execution

STEP 01

1. Survey & Casing Installation

Survey coordinates precisely per structural plan. Drive temporary steel casing into soil to prevent wall collapse and water infiltration.

EQUIPMENT CLEARANCE

Tripod Rig & Site Access Specifications

Minimum headroom, entrance width, and machinery weight specs for project engineers.

Equipment & Clearance Spec Sheet

Tripod Rig & Site Access Specifications for Engineers

Min. Headroom Required:3.00 - 3.50 เมตร
Min. Entrance Width:1.50 เมตร (เข้าซอยแคบ/ประตูบ้านได้สบาย)
Rig Weight & Mobility:ประมาณ 3 - 4 ตัน (แยกถอดชิ้นส่วนย้ายง่าย)
Est. Production Rate:2 - 4 ต้น / วัน / ชุด
⚙️ Standard Tripod Drilling Rig

Perfect for urban homes, narrow alleys, and restricted spaces with zero vibration.

FIELD COMPARISON

Real Site Before & After Interactive Comparison

Compare site conditions before access vs during dry-process tripod rig drilling.

BEFORE / AFTER DEMO

เปรียบเทียบภาพการเข้าทำงานในพื้นที่จริง

Tawanchai Bored Pile Field Site Comparison - AfterDuring Dry-Process Tripod Drilling
Tawanchai Bored Pile Field Site Comparison - BeforeBefore (Tight Access / Boundary Wall)

Working process

Dry-process bored piles using a tripod rig

Request a quotation
  1. 01

    Set the tripod rig

    Position the tripod rig at the centre of the pile

  2. 02

    Drive temporary casing

    Connect the casing sections and control pile alignment

  3. 03

    Excavate the bore

    Use the bucket to remove soil to the required level

  4. 04

    Install reinforcement

    Lower and centre the reinforcement cage in the bore

  5. 05

    Place concrete

    Place concrete while withdrawing the casing in stages

Articles

Information about bored piles

View all
📞Call💬LINE