Dry-process bored piles
Dry-process bored piles in 0.35, 0.40, 0.50, and 0.60 metre diameters.
- Tripod rig
- Temporary casing
Dry-process bored-pile contractor
Dry-process bored piles in 0.35, 0.40, 0.50, and 0.60 metre diameters, backed by more than 20 years of experience, skilled crews, and engineering support.
Send the diameter, quantity, length, and location for a preliminary quotation

ENGINEERING CALCULATOR
Calculate concrete volume, steel cage weight, safe load capacity, and budget instantly.
Select pile diameter, depth, and quantity to calculate concrete, steel, safe load capacity, and get an instant quote via LINE.
* Calculations are preliminary engineering estimates. Tawanchai engineers inspect site conditions before issuing final quotes.
Our services
We provide complete bored-pile work, pile testing, and advice on the dry-process bored-pile method.
Dry-process bored piles in 0.35, 0.40, 0.50, and 0.60 metre diameters.
A complete bored-pile service covering materials, equipment, and labour.
Pile-integrity testing using stress-wave signals.
Testing used to analyse pile load-bearing capacity.
30-SECOND DECISION WIZARD
Answer 3 quick questions to receive personalized pile diameter and depth recommendations.
GEOTECHNICAL DATABASE
Check estimated hard soil layer depth and recommended casing length for your area.
Soft clay layer is approximately 12-14m thick. Deep casing is recommended to prevent hole collapse and water seepage.
Survey coordinates precisely per structural plan. Drive temporary steel casing into soil to prevent wall collapse and water infiltration.
EQUIPMENT CLEARANCE
Minimum headroom, entrance width, and machinery weight specs for project engineers.
Perfect for urban homes, narrow alleys, and restricted spaces with zero vibration.
FIELD COMPARISON
Compare site conditions before access vs during dry-process tripod rig drilling.
During Dry-Process Tripod Drilling
Before (Tight Access / Boundary Wall)Position the tripod rig at the centre of the pile
Connect the casing sections and control pile alignment
Use the bucket to remove soil to the required level
Lower and centre the reinforcement cage in the bore
Place concrete while withdrawing the casing in stages
Bored-pile projects


Soi Phrom Sut Anuson, Ratchada–Sutthisan

Articles

A cast-in-place concrete pile formed by excavating a borehole, installing a steel reinforcement cage, and placing concrete with minimal vibration.
Read article
Detailed process of dry bored piling: setting tripod rig, casing installation, bucket auger boring, rebar cage placement, concrete pouring, and casing withdrawal.
Read article
Why bored piles are the top foundation choice for urban sites: low noise and vibration, protection of adjacent structures, and tight access suitability.
Read article