Engineering Tools

Bored Pile Engineering Tools

A collection of engineering calculators and guides for contractors and engineers to help estimate costs and make informed decisions.

ENGINEERING CALCULATOR

Bored Pile Material & Safe Load Estimator

Calculate concrete volume, steel cage weight, safe load capacity, and budget instantly.

100% Free Engineering Tool

Bored Pile Material & Load Capacity Estimator

Select pile diameter, depth, and quantity to calculate concrete, steel, safe load capacity, and get an instant quote via LINE.

20 meters
10m20m32m
10 piles
1 ต้น50 ต้น150 ต้น
Total Concrete Volume (+5% margin)20.3
Est. Steel Cage Weight1,523 kg
Safe Load Capacity per Pile~39 Tons / pile
Estimated Budget Range143,000 - 173,000 THB
⚠️This is a preliminary budget estimate only — not a final quote. Contact us for an official quotation after site inspection.
Send Specs to Get LINE Quote

* Calculations are preliminary engineering estimates. Tawanchai engineers inspect site conditions before issuing final quotes.

30-SECOND DECISION WIZARD

Smart Bored Pile Selection Wizard

Answer 3 questions to get the safest pile size and depth recommendation for your project.

30-Second Smart Wizard

Find the Ideal Bored Pile Specs for Your Building

Engineering Recommendation
Recommended Pile DiameterØ 35 - 50 cm
Recommended Depth Range18 - 24 เมตร
Vibration & Neighbor Risk Level🟢 100% Safe, Zero-vibration, Quiet Operation
Send Specs to LINE for Quote

GEOTECHNICAL DATABASE

Soil Depth Guide for 77 Provinces

Check hard soil depth levels and recommended casing lengths by region.

77 Province Soil Engineering Guide

Check Recommended Pile Specs & Soil Depths for Your Zone

Est. Hard Soil Layer Depth20 - 24 เมตร
Recommended Casing Length12 - 15 เมตร (ป้องกันดินเหนียวอ่อนทรุด)
Popular Pile Diameters in AreaØ 35 - 60 ซม. (ตามน้ำหนักอาคาร)
💡 Geotechnical Engineering Tip:

Soft clay layer is approximately 12-14m thick. Deep casing is recommended to prevent hole collapse and water seepage.

Standard Engineering Workflow

Dry-Process Bored Pile Step-by-Step Execution

STEP 01

1. Survey & Casing Installation

Survey coordinates precisely per structural plan. Drive temporary steel casing into soil to prevent wall collapse and water infiltration.

EQUIPMENT CLEARANCE

Tripod Rig Specs & Access Clearance

Ceiling height, entrance width, and machinery weight specs for engineers and contractors.

Equipment & Clearance Spec Sheet

Tripod Rig & Site Access Specifications for Engineers

Min. Headroom Required:3.00 - 3.50 เมตร
Min. Entrance Width:1.50 เมตร (เข้าซอยแคบ/ประตูบ้านได้สบาย)
Rig Weight & Mobility:ประมาณ 3 - 4 ตัน (แยกถอดชิ้นส่วนย้ายง่าย)
Est. Production Rate:2 - 4 ต้น / วัน / ชุด
⚙️ Standard Tripod Drilling Rig

Perfect for urban homes, narrow alleys, and restricted spaces with zero vibration.

📞Call💬LINE