Dry-process bored piles
The main equipment comprises a tripod, temporary casing, digging bucket, cylindrical hammer, and air winch. The equipment is compact, mobile, and does not require a large working area.
- Tripod rig
- Temporary casing
- Reinforcement and concrete placed in the bore
