Dry-process bored-pile project
35 cm bored piles in the Ratchada–Sutthisan area
A real dry-process 35 cm bored-pile work site in the Ratchada–Sutthisan area, documented in a Tawanchai Facebook post.
LOCATIONSoi Phrom Sut Anuson, Ratchada–Sutthisan

01
Project details
The urban location required attention to site access, working clearance, excavated-soil handling, and equipment placement around the pile locations.
02
Site note
The crew carried out 35 cm dry-process bored-pile work and documented activity around the pile head. The post does not state pile quantity, depth, or load capacity; those details must be verified from project drawings and records before engineering use.