Dry-process bored-pile project

35 cm bored piles in the Ratchada–Sutthisan area

A real dry-process 35 cm bored-pile work site in the Ratchada–Sutthisan area, documented in a Tawanchai Facebook post.

LOCATIONSoi Phrom Sut Anuson, Ratchada–Sutthisan
Crew member inspecting a dry-process bored-pile head in the Ratchada–Sutthisan area
01

Project details

The urban location required attention to site access, working clearance, excavated-soil handling, and equipment placement around the pile locations.

02

Site note

The crew carried out 35 cm dry-process bored-pile work and documented activity around the pile head. The post does not state pile quantity, depth, or load capacity; those details must be verified from project drawings and records before engineering use.

View the original work-site post on Facebook