Pile cap design and ground beam integration with bored piles
Detailed engineering guidelines on pile head chipping, pile cap concrete casting, and rebar dowel anchorage (40D-50D) into ground beams.

Pile trimming and rebar anchorage
Chip away weak top laitance down to sound concrete, exposing main rebar dowels extending 40D-50D into the pile cap footing.
Interested in bored-pile services?
We are happy to advise on dry-process bored piles. Call 086-888-7703 for more information.

