Bored piling in Pathum Thani canal zones and subsidence mitigation

Engineering bored pile guidelines for Pathum Thani canal districts (Khlong 1-15) mitigating soil caving and negative skin friction.

Bored pile construction near Pathum Thani canal embankment
01

Pathum Thani canal zone piling

Pathum Thani canal zones feature high water tables; drive casing 14-16m into medium clay to seal off water and prevent caving.

Interested in bored-pile services?

We are happy to advise on dry-process bored piles. Call 086-888-7703 for more information.

📞Call💬LINE