Pile cap design and ground beam integration with bored piles

Detailed engineering guidelines on pile head chipping, pile cap concrete casting, and rebar dowel anchorage (40D-50D) into ground beams.

Pile head laitance chipping and footing formwork preparation
01

Pile trimming and rebar anchorage

Chip away weak top laitance down to sound concrete, exposing main rebar dowels extending 40D-50D into the pile cap footing.

Interested in bored-pile services?

We are happy to advise on dry-process bored piles. Call 086-888-7703 for more information.