Concrete bleed water and laitance layer management in bored piling

Understanding concrete bleeding and laitance accumulation at pile tops and over-pouring requirements for subsequent chipping.

Over-pouring bored pile top concrete displacing laitance water layer
01

Bleed water and laitance control

Fresh concrete forces laitance mud and bleed water to the surface; over-pouring 30-50 cm ensures all weak laitance is chipped off.