In-depth tripod bored pile rig components and winch specs

Explore the core components of dry tripod piling rigs: tripod A-frame legs, pneumatic air winches, drop hammers, and auger buckets.

Tripod bored pile rig setup featuring air winch and A-frame assembly
01

Tripod rig machinery breakdown

Tripod rigs consist of 3-4 inch steel pipe legs, 3-5 ton capacity air winches, drop hammers, and bottom-valve auger buckets.

Interested in bored-pile services?

We are happy to advise on dry-process bored piles. Call 086-888-7703 for more information.

📞Call💬LINE