Reading and preparing bored pile Bill of Quantities (BOQ)
A guide to understanding bored pile BOQ items: cost per meter/pile, integrity testing fees, and equipment mobilization costs.

Bored pile BOQ line items
Bored pile BOQs break down into: 1) Equipment mobilization, 2) Per pile/meter drilling and concreting, 3) Seismic integrity test fees.
Interested in bored-pile services?
We are happy to advise on dry-process bored piles. Call 086-888-7703 for more information.


