Concrete mix design and slump control for bored piles

Concrete mix specifications, slump control (10-12 cm for dry process), and compressive strength (240-280 ksc) for self-compacting bored piles.

Concrete slump testing for bored pile placement at work site
01

Bored pile concrete slump specs

Dry process bored pile concrete requires 10-12 cm slump for self-compacting flow around rebar cages without mechanical vibrators.

Interested in bored-pile services?

We are happy to advise on dry-process bored piles. Call 086-888-7703 for more information.

📞Call💬LINE