Strap and cantilever footing design with boundary bored piles

Using strap beams and cantilever footings with boundary bored piles to transfer eccentric wall loads inward safely.

Strap footing construction over boundary line bored piles
01

Strap footing offset load transfer

When boundary piles are offset 50-70 cm from property lines, strap beams transfer eccentric moments inward to interior piles.

Interested in bored-pile services?

We are happy to advise on dry-process bored piles. Call 086-888-7703 for more information.

📞Call💬LINE