Chiang Mai intermontane basin and Ping river gravel bed bored piling

Bored pile drilling techniques penetrating dense Ping river gravel beds across Chiang Mai, Hang Dong, Mae Rim, and Saraphi.

Auger bucket drilling penetrating gravel strata in Chiang Mai basin
01

Chiang Mai bored piling

Chiang Mai basin contains dense gravel beds; drilling requires gravel buckets with casing protection preventing stones falling into bores.

Interested in bored-pile services?

We are happy to advise on dry-process bored piles. Call 086-888-7703 for more information.

📞Call💬LINE