Common bored pile flaws and site quality control remedies
Causes and engineering prevention techniques for common bored pile flaws: borehole wall caving, necking, concrete voids, and offset.

Preventing bored pile flaws
Prevent caving by seating casing 1-2m into stiff clay; prevent necking by keeping 2-3m concrete head inside casing during pullout.
Interested in bored-pile services?
We are happy to advise on dry-process bored piles. Call 086-888-7703 for more information.
