Preventing building differential settlement using bored piles

Causes of structural wall cracks from differential settlement and prevention using uniform bored pile tip founding levels.

Bored pile foundation installation preventing building tilt and cracks
01

Preventing differential settlement

Differential settlement stems from uneven pile tip strata; anchoring all bored pile tips in the same stiff clay layer eliminates structural tilt.

Interested in bored-pile services?

We are happy to advise on dry-process bored piles. Call 086-888-7703 for more information.

📞Call💬LINE