Grouting repair methods for honeycombed bored piles

Engineering core drilling and non-shrink cement grouting procedures repairing honeycombed or soil-included bored pile shafts.

High-pressure non-shrink cement grouting repair on honeycombed pile shaft
01

Grouting repair procedure

Remedying internal voids involves core drilling to the defect depth and injecting high-pressure non-shrink grout to restore structural capacity.

Interested in bored-pile services?

We are happy to advise on dry-process bored piles. Call 086-888-7703 for more information.

📞Call💬LINE