Moment-resisting pile-to-cap connection engineering
Detailed design specifications for pile head embedment into footings (5-10 cm) and rebar dowel anchorage for moment transfer.

Pile head to footing connection
The bored pile top embeds 5-10 cm into footing concrete with 40D dowels creating a rigid moment-resisting joint.
Interested in bored-pile services?
We are happy to advise on dry-process bored piles. Call 086-888-7703 for more information.


